× |
|
design and fabrication of a dual wheel wheelbarrow |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
DESIGN AND CONSTRUCTION OF A 555 TIMER IC TESTER |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
It is the aim of this study to assess the trend of development in kwara state and to see to what extent the various development plans had been able to meet their objectives. |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
DESIGN AND CONSTRUCTION OF A 60AMPS AUTOMATIC CHANGEOVER WITH GENERATOR AUTO START AND TIMER |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
DESIGN AND CONSTRUCTION OF A 220V LIVE WIRE SCANNER |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
Design And Construction Of An Automatic Popcorn Making Machine |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
design and construction of a 3kva fuelless generator |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
RECTIFICATION AND REPAIR OF A FAULTY AIR CONDITIONER |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
THE DESIGN AND CONSTRUCTION A 5KVA AUTOMATIC VOLTAGE STABILIZER |
₦ 5,000.00 |
|
₦ 5,000.00 |
|