Cart

Remove item Thumbnail image Product Price Quantity Subtotal
× Placeholder THE DESIGN AND CONSTRUCTION A 2KVA STABILIZER  5,000.00
 5,000.00
× Placeholder Economic analysis of turkey production (a case study of enugu state)  5,000.00
 5,000.00
× Placeholder Adolesent’s Perception Towards Nursing As A Choice Of Career Amoug S.S.S.3 Student Of Selected Senior Secondary School In Ilorin Abdul Kabir Rofiat  5,000.00
 5,000.00
× Placeholder Design and construction of a solar irrigation system  5,000.00
 5,000.00
× Placeholder DESIGN AND CONSTRUCTION OF A 5KVA PURE SINEWAVE POWER INVERTER SYSTEM  5,000.00
 5,000.00

Cart totals

Subtotal  14,995.00
Total  14,995.00