Cart Remove item Thumbnail image Product Price Quantity Subtotal × construction of a 12v automatic battery charger ₦ 5,000.00 construction of a 12v automatic battery charger quantity ₦ 5,000.00 × Determination Of Geotechnical Properties Of Soil For The Strip Foundation ₦ 5,000.00 Determination Of Geotechnical Properties Of Soil For The Strip Foundation quantity ₦ 5,000.00 × Economic analysis of turkey production (a case study of enugu state) ₦ 5,000.00 Economic analysis of turkey production (a case study of enugu state) quantity ₦ 5,000.00 × design and construction of a digital car battery charger ₦ 5,000.00 design and construction of a digital car battery charger quantity ₦ 5,000.00 Update cart Cart totals Subtotal ₦ 11,996.00 Total ₦ 11,996.00 Proceed to checkout