Cart Remove item Thumbnail image Product Price Quantity Subtotal × Design And Construction Of An Rfid Based Door Lock System ₦ 5,000.00 Design And Construction Of An Rfid Based Door Lock System quantity ₦ 5,998.00 × Design And Construction Of A 3.5kva Pure Sine Wave Inverter ₦ 5,000.00 Design And Construction Of A 3.5kva Pure Sine Wave Inverter quantity ₦ 5,000.00 × effect of quarry dust on the engineering properties of lateritic soils ₦ 5,000.00 effect of quarry dust on the engineering properties of lateritic soils quantity ₦ 5,000.00 Update cart Cart totals Subtotal ₦ 11,996.00 Total ₦ 11,996.00 Proceed to checkout