Cart

Remove item Thumbnail image Product Price Quantity Subtotal
× Placeholder design, construction and installation of electric outdoor solar powered wall clock  5,000.00
 8,997.00
× Placeholder THE DESIGN AND CONSTRUCTION A 5KVA AUTOMATIC VOLTAGE STABILIZER  5,000.00
 5,000.00
× Placeholder Design And Construction Of a generator Power Booster  5,000.00
 5,000.00
× Placeholder THE DESIGN AND CONSTRUCTION A 2KVA STABILIZER  5,000.00
 5,000.00
× Placeholder DESIGN AND CONSTRUCTION OF A 555 TIMER IC TESTER  5,000.00
 5,000.00
× Placeholder DESIGN AND CONSTRUCTION OF AN AUTOMATIC INTRUDER ALARM SYSTEM USING INFRARED AND 7-SEGMENT DISPLAY  5,000.00
 5,000.00
× Placeholder design, construction and installation of electric outdoor solar powered analogue wall clock  5,000.00
 5,000.00
× Placeholder Design And Production Of Ceiling Board Using Plaster Of Paris (P.O.P) Gypsum Material  5,000.00
 5,000.00
× Placeholder DESIGN AND CONSTRUCTION OF A 16-WAY CLAP OPERATED SWITCH  5,000.00
 5,000.00
× Placeholder RECTIFICATION AND REPAIR OF A FAULTY AIR CONDITIONER  5,000.00
 5,000.00
× Placeholder Design, Construction And Analysis Of A Digital Ac/Dc Voltmeter Using Pic16f877a Microcontroller  5,000.00
 5,000.00
× Placeholder AN ASSESSMENT OF COMMERCIAL VEHICLE DRIVERS: KNOWLEDGE ON THE USE OF ROAD SIGNS AS MEANS OF PREVENTING ACCIDENTS  5,000.00
 5,000.00
× Placeholder Consequences and evaluation of the involvement of foreign companies in road constriction in kwara state.  5,000.00
 5,000.00
× Placeholder The Impact Of Internal Control System On The Financial Management Of An Organization (A Case Study Of The Nigeria Bottling Company Plc, Enugu)  5,000.00
 5,000.00

Cart totals

Subtotal  47,984.00
Total  47,984.00