×
evaluation of the physico-chemical, sensory, microbial, proximate and micronutrients stability of dambo nama
₦ 5,000.00
evaluation of the physico-chemical, sensory, microbial, proximate and micronutrients stability of dambo nama quantity
₦ 5,000.00
×
DESIGN AND CONSTRUCTION OF AN AUTOMATIC INTRUDER ALARM SYSTEM USING INFRARED AND 7-SEGMENT DISPLAY
₦ 5,000.00
DESIGN AND CONSTRUCTION OF AN AUTOMATIC INTRUDER ALARM SYSTEM USING INFRARED AND 7-SEGMENT DISPLAY quantity
₦ 5,000.00
×
design and construction of an industrial robot arm
₦ 5,000.00
design and construction of an industrial robot arm quantity
₦ 5,000.00
×
DESIGN AND CONSTRUCTION OF A 220V LIVE WIRE SCANNER
₦ 5,000.00
DESIGN AND CONSTRUCTION OF A 220V LIVE WIRE SCANNER quantity
₦ 5,000.00
×
DESIGN AND CONSTRUCTION OF A 6V DC POWER SUPPLY
₦ 5,000.00
DESIGN AND CONSTRUCTION OF A 6V DC POWER SUPPLY quantity
₦ 5,000.00
×
Consequences and evaluation of the involvement of foreign companies in road constriction in kwara state.
₦ 5,000.00
Consequences and evaluation of the involvement of foreign companies in road constriction in kwara state. quantity
₦ 5,000.00
×
COMPARATIVE ANALYSIS OF THE MICROBIOLOGICAL AND PHYSIOCHEMICAL PROFILE OF USUMA DAM RAW WATER AND TAP WATER IN BWARI
₦ 5,000.00
COMPARATIVE ANALYSIS OF THE MICROBIOLOGICAL AND PHYSIOCHEMICAL PROFILE OF USUMA DAM RAW WATER AND TAP WATER IN BWARI quantity
₦ 5,000.00
×
A WAY OF RECYCLING PLASTIC THAT CAN BE USEFUL IN CONSTRUCTION
₦ 5,000.00
A WAY OF RECYCLING PLASTIC THAT CAN BE USEFUL IN CONSTRUCTION quantity
₦ 5,000.00
×
fabrication of metal storage rack
₦ 5,000.00
fabrication of metal storage rack quantity
₦ 5,000.00
×
Comparison Of Cost On The Design Of Flexible And Rigid Pavement
₦ 5,000.00
Comparison Of Cost On The Design Of Flexible And Rigid Pavement quantity
₦ 5,000.00
×
Local Government As The Agent Of Community (A Case Study Of Ilorin East Local Government.)
₦ 5,000.00
Local Government As The Agent Of Community (A Case Study Of Ilorin East Local Government.) quantity
₦ 5,000.00
×
operation and maintenance of steam boiler
₦ 5,000.00
operation and maintenance of steam boiler quantity
₦ 5,000.00
×
DESIGN AND CONSTRUCTION OF A 3.5KVA POWER INVERTER
₦ 5,000.00
DESIGN AND CONSTRUCTION OF A 3.5KVA POWER INVERTER quantity
₦ 5,000.00
×
DESIGN AND CONSTRUCTION OF A 555 TIMER PWM AUDIO AMPLIFIER
₦ 5,000.00
DESIGN AND CONSTRUCTION OF A 555 TIMER PWM AUDIO AMPLIFIER quantity
₦ 5,000.00
×
DESIGN AND CONSTRUCTION OF AN ELECTRONIC DICE DISPLAY WITH AUDIO UNIT
₦ 5,000.00
DESIGN AND CONSTRUCTION OF AN ELECTRONIC DICE DISPLAY WITH AUDIO UNIT quantity
₦ 5,000.00
×
Nigeria And Challenges Of Promoting Gender Equality (Case Study Of Abia State Starting From Its Creation To 2015)
₦ 5,000.00
Nigeria And Challenges Of Promoting Gender Equality (Case Study Of Abia State Starting From Its Creation To 2015) quantity
₦ 5,000.00
Update cart