Cart

Remove item Thumbnail image Product Price Quantity Subtotal
× Placeholder THE DESIGN AND CONSTRUCTION A 2KVA STABILIZER  5,000.00
 5,000.00
× Placeholder Determination Of Geotechnical Properties Of Soil For The Strip Foundation  5,000.00
 5,000.00
× Placeholder DESIGN AND CONSTRUCTION OF A 555 TIMER PWM AUDIO AMPLIFIER  5,000.00
 5,000.00
× Placeholder A WAY OF RECYCLING PLASTIC THAT CAN BE USEFUL IN CONSTRUCTION  5,000.00
 5,000.00

Cart totals

Subtotal  11,996.00
Total  11,996.00