× |
|
DESIGN AND INSTALLATION OF A 7.5KVA SOLAR INVERTER |
₦ 4,999.00 |
|
₦ 4,999.00 |
× |
|
Bamboo Leaf Ash As A Partial Replacement Of Cement In Concrete |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
DESIGN AND CONSTRUCTION OF A 555 TIMER PWM AUDIO AMPLIFIER |
₦ 5,000.00 |
|
₦ 5,998.00 |
× |
|
DESIGN AND CONSTRUCTION OF A 500VA PHOTO VOLTAIC SYSTEM |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
DESIGN AND CONSTRUCTION OF A 220V LIVE WIRE SCANNER |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
Economic analysis of turkey production (a case study of enugu state) |
₦ 5,000.00 |
|
₦ 5,998.00 |
× |
|
CHARACTERIZATION OF NIGERIAN FELDSPAR |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
Design And Construction Of a generator Power Booster |
₦ 5,000.00 |
|
₦ 5,000.00 |
|