× |
|
evaluation of the physico-chemical, sensory, microbial, proximate and micronutrients stability of dambo nama |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
DESIGN AND CONSTRUCTION OF AN AUTOMATIC INTRUDER ALARM SYSTEM USING INFRARED AND 7-SEGMENT DISPLAY |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
design and construction of an industrial robot arm |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
DESIGN AND CONSTRUCTION OF A 220V LIVE WIRE SCANNER |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
DESIGN AND CONSTRUCTION OF A 6V DC POWER SUPPLY |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
Consequences and evaluation of the involvement of foreign companies in road constriction in kwara state. |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
COMPARATIVE ANALYSIS OF THE MICROBIOLOGICAL AND PHYSIOCHEMICAL PROFILE OF USUMA DAM RAW WATER AND TAP WATER IN BWARI |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
A WAY OF RECYCLING PLASTIC THAT CAN BE USEFUL IN CONSTRUCTION |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
fabrication of metal storage rack |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
Comparison Of Cost On The Design Of Flexible And Rigid Pavement |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
Local Government As The Agent Of Community (A Case Study Of Ilorin East Local Government.) |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
operation and maintenance of steam boiler |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
DESIGN AND CONSTRUCTION OF A 3.5KVA POWER INVERTER |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
DESIGN AND CONSTRUCTION OF A 555 TIMER PWM AUDIO AMPLIFIER |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
DESIGN AND CONSTRUCTION OF AN ELECTRONIC DICE DISPLAY WITH AUDIO UNIT |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
Nigeria And Challenges Of Promoting Gender Equality (Case Study Of Abia State Starting From Its Creation To 2015) |
₦ 5,000.00 |
|
₦ 5,000.00 |
|