Cart

Remove item Thumbnail image Product Price Quantity Subtotal
× Placeholder DESIGN AND CONSTRUCTION OF A 1KM TRANSMITTER  5,000.00
 5,000.00
× Placeholder DESIGN AND CONSTRUCTION OF A 60AMPS AUTOMATIC CHANGEOVER WITH GENERATOR AUTO START AND TIMER  5,000.00
 5,000.00
× Placeholder Design And Construction Of An Automatic Solar Powered Hand Washing Machine  5,000.00
 5,000.00
× Placeholder RECTIFICATION AND REPAIR OF A FAULTY AIR CONDITIONER  5,000.00
 5,998.00
× Placeholder DESIGN AND CONSTRUCTION OF A 220V LIVE WIRE SCANNER  5,000.00
 5,000.00
× Placeholder Fuel Subsidy Removal And The Nigerian Economy (A Case Study Of Abakiliki Local Government Area, Ebonyi State)  5,000.00
 5,000.00

Cart totals

Subtotal  20,993.00
Total  20,993.00