Cart

Remove item Thumbnail image Product Price Quantity Subtotal
× Placeholder DESIGN AND CONSTRUCTION OF A 1W LED DRIVERS FOR AUTOMOTIVE APPLICATIONS  5,000.00
 5,000.00
× Placeholder Design And Construction Of a generator Power Booster  5,000.00
 5,000.00
× Placeholder Challenges associated with valuation of specialized properties (a case study of hope alive trust hospital idofian kwara state)  5,000.00
 5,000.00
× Placeholder Design and construction of a solar irrigation system  5,000.00
 5,000.00
× Placeholder Development Of Magnesium Composite Derived From Waste: Egg Shell And Cow Bone (Orthopedic Application)  5,000.00
 5,998.00

Cart totals

Subtotal  17,994.00
Total  17,994.00