Cart

Remove item Thumbnail image Product Price Quantity Subtotal
× Placeholder Bureaucracy As A Tool For Effective Performance In A Public Sector A Case Study Of Kwara State Polytechnic Ilorin  5,000.00
 5,000.00
× Placeholder DESIGN AND CONSTRUCTION OF A 4-CHANNEL AUDIO MIXER  5,000.00
 5,000.00
× Placeholder DESIGN AND CONSTRUCTION OF A 555 TIMER IC TESTER  5,000.00
 5,000.00
× Placeholder evaluation of the physico-chemical, sensory, microbial, proximate and micronutrients stability of dambo nama  5,000.00
 5,000.00
× Placeholder Impact Of Collective Bargaining On The Services Industry (A Case Study Of P.H.C.N)  5,000.00
 5,000.00

Cart totals

Subtotal  14,995.00
Total  14,995.00