× |
|
RECTIFICATION AND REPAIR OF A FAULTY AIR CONDITIONER |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
AN ASSESSMENT OF COMMUNITY KNOWLEDGE AND ALTITUDE TOWARDS EMERGENCY HEALTH SITUATION IN CENTRAL HOSPITAL UGHELLI |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
ATHROPOD PREDATORS AND INSECT PEST CONTROL |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
Design And Construction Of a generator Power Booster |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
DESIGN AND CONSTRUCTION OF A 5KVA PURE SINEWAVE POWER INVERTER SYSTEM |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
DESIGN AND CONSTRUCTION OF A DIGITAL THERMOMETER USING ARDUINO AND LM35 TEMPERATURE SENSOR |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
DESIGN AND CONSTRUCTION OF A 16-WAY CLAP OPERATED SWITCH |
₦ 5,000.00 |
|
₦ 5,000.00 |
× |
|
DESIGN AND CONSTRUCTION OF A 4-CHANNEL AUDIO MIXER |
₦ 5,000.00 |
|
₦ 5,000.00 |
|