Cart

Remove item Thumbnail image Product Price Quantity Subtotal
× Placeholder DESIGN AND CONSTRUCTION OF A 6V DC POWER SUPPLY  5,000.00
 5,000.00
× Placeholder Manpower Planning And Development As An Effective Tool For Achieving Organizational Goals. (A Case Study Of Star Paper Mill Ltd, Aba)  5,000.00
 5,000.00
× Placeholder THE DESIGN AND CONSTRUCTION A 2KVA STABILIZER  5,000.00
 5,000.00
× Placeholder The Impact Of Credit Management On The Profitability Of A Manufacturing Firm (A Case Study Of Unilever Plc Aba, Nigeria).  5,000.00
 5,000.00
× Placeholder Problems And Prospects Of Auditing In Government Organization (A Case Study Of Federal Mortgage Bank Enugu State)  5,000.00
 5,000.00
× Placeholder DESIGN AND CONSTRUCTION OF A 16-WAY CLAP OPERATED SWITCH  5,000.00
 5,000.00

Cart totals

Subtotal  17,994.00
Total  17,994.00