Cart Remove item Thumbnail image Product Price Quantity Subtotal × An investigation into the role of gsm operation in developing direct market in nigeria (a case study of mtn nigeria) ₦ 5,000.00 An investigation into the role of gsm operation in developing direct market in nigeria (a case study of mtn nigeria) quantity ₦ 5,000.00 × DESIGN AND CONSTRUCTION OF AN AUTOMATIC LED STREET LIGHT USING ELECTRONICS LDR AND PIR SENSOR ₦ 5,000.00 DESIGN AND CONSTRUCTION OF AN AUTOMATIC LED STREET LIGHT USING ELECTRONICS LDR AND PIR SENSOR quantity ₦ 5,000.00 × DESIGN AND CONSTRUCTION OF A 60AMPS AUTOMATIC CHANGEOVER WITH GENERATOR AUTO START AND TIMER ₦ 5,000.00 DESIGN AND CONSTRUCTION OF A 60AMPS AUTOMATIC CHANGEOVER WITH GENERATOR AUTO START AND TIMER quantity ₦ 5,000.00 Update cart Cart totals Subtotal ₦ 8,997.00 Total ₦ 8,997.00 Proceed to checkout