Cart

Remove item Thumbnail image Product Price Quantity Subtotal
× Placeholder development and per formance evaluation of durability testing machine  5,000.00
 5,000.00
× Placeholder Accounting In The Hospitality Industry: A Case Study Of Joe-Continental Hotel  5,000.00
 5,000.00
× Placeholder Effect Of Waste Engine Oil Contamination On Geotechnical Properties Of Clay Soil  5,000.00
 5,000.00
× Placeholder design and construction of a digital soil moisture meter using the 555 timer  5,000.00
 5,000.00
× Placeholder Design, Fabrication And Performance Evaluation Of A Battery Operated Solar Charged Boom Sprayer  5,000.00
 5,000.00
× Placeholder A COMPARATIVE AND COST EFFECTIVENESS ANALYSIS OF CLOUD COMPUTING IN NIGERIA  5,000.00
 5,000.00

Cart totals

Subtotal  17,994.00
Total  17,994.00